Hiring a Firm for Data Validation, Modeling and Designing of Mitigation Strategy against HVDC Interference with SNGPL’s Transmission & Distribution Pipelines

Tender No: TS0000002380E

Corrigendum Issued
This tender has closed

Closing Date: Apr 28, 2026 11:00 AM

Organization/Office Details

  • Organization Name: Ministry of Energy (Petroleum Division)
  • Office Name: Corrosion Control Head Office Lahore
  • Office Address: Ground Floor, LDA Plaza, Egerton Road Lahore
  • City: Lahore
  • Contact Person: Muhammad Awais Ali Zubair
  • Contact Email: awais.zubair@sngpl.com.pk
  • Contact Phone: +92-429-920-1418

Tender Information

Tender Type Tender Notice
Tender No / Reference No / Tender Inquiry No SNT/CC/HVDC/2026/01
Procurement Category Works
Procurement Procedure Single Stage-Two Envelope
Sector Services
Tender Nature International
Description
SNGPL intends to hire the services of a local/foreign contractor firm specialized in providing consultancy on assessments of corrosion threats due to HVDC interference with gas pipelines, having adequate experience/expertise in carrying out studies/modeling for HVDC interference with underground metallic gas pipelines and advising comprehensive solutions to ensure the incident-free and safe operation of SNGPL’s pipeline system in the vicinity of HVDC electrode station & power line. The bidder may be a joint venture of local and multinational companies, each having relevant expertise in similar works and a sound professional reputation. The bidder must have successfully completed at least three (3) similar projects for oil & gas pipeline companies. Details and certificates of satisfaction from the clients of previously completed jobs of similar nature must be attached as evidence
Note
Hiring a Firm for Data Validation, Modeling and Designing of Mitigation Strategy against HVDC Interference with SNGPL’s Transmission & Distribution Pipelines
Remarks
The study shall be carried out and analyzed by qualified and experienced personnel, utilizing appropriate and industry-accepted analytical methods, algorithms, and software as applicable. The findings shall be compiled into a clear and comprehensible report. Based on the results of the study, the contractor shall provide definitive conclusions and comprehensive recommendations, including comprehensive solutions to the above interference issues. The relevant and applicable standards, including but not limited to ASME, NACE (AMPP), ASTM, and other accepted industry practices, shall be followed for guidelines in this regard. updated Adds for corrigendum in News papers will be published in News Papers on 15-4-2026

Important Dates

Advertisement Date April 14, 2026
Closing Date & Time April 28, 2026 at 11:00 AM
Opening Time 11:30 AM

Financial Information

Bid Security 100,000.00
Bid Validity 180 days

Corrigendum History (1)

Corrigendum #1

Issued On: April 14, 2026 11:33 AM

Updated Closing Date: April 15, 2026

Remarks: The study shall be carried out and analyzed by qualified and experienced personnel, utilizing appropriate and industry-accepted analytical methods, algorithms, and software as applicable. The findings shall be compiled into a clear and comprehensible report. Based on the results of the study, the contractor shall provide definitive conclusions and comprehensive recommendations, including comprehensive solutions to the above interference issues. The relevant and applicable standards, including but not limited to ASME, NACE (AMPP), ASTM, and other accepted industry practices, shall be followed for guidelines in this regard.

Scroll