Delisted Archive - Blacklisted/Debarred Firms - Pakistan

Archive of firms that have been removed from the active blacklist after completing their debarment period.

About Delisted Firms Archive

The following firms were temporarily blacklisted/debarred by the procuring agencies. These firms have now been removed from the active list of blacklisted/debarred firms.

Firms are automatically delisted when their blacklist period expires, or may be manually delisted by authorized procurement agencies before the expiry date. This archive maintains a historical record of all debarment actions for transparency and reference purposes.

Total Delisted

173

Firms removed from blacklist
Search across all fields
Reset

Showing 100 of 173 delisted firms

Page 1 of 2

Delisted Firms Archive

Sr # PPRA BLK Number Firm Name Procurement Agency Duration Type Blacklist Period Reasons Remarks
1 BLK-390
BLK-2026-000391
M/s. WOSCO Metering (Pvt.) Ltd.
GEPCO 3 Years
From: Jun 24, 2026
To: Jun 23, 2029
2 Years 10 Months
wilful and deliberate non-disclosure of the fact
The Blacklisting order dated 24-06-2026 passed by GEPCO is set-aside by the PPRA dated 04-09-2026.
2 BLK-378
BLK-2026-000186
Ms Powerchina SEPCO-1 Electric Power Construction Company Ltd
National Grid Company of Pakistan (NGC) 3 Months
From: May 12, 2026
To: Aug 11, 2026
1 Month
Failure to submit performance guarantee
Duration Completed
3 BLK-377
BLK-2026-000190
M/S Open Testing Service (OTS)
Water and Power Development Authority (WAPDA) 5 Years
From: Apr 29, 2026
To: Apr 28, 2031
4 Years 10 Months
Submission of fabricated/false financial statements
The Blacklisting order dated 29-04-2026 passed by WAPDA is set-aside by the PPRA dated 24-06-2026
4 BLK-357
BLK-2026-000015
M/s Nazir Ahmed & Sons Construction Company (SMCS) Pvt. Ltd. and M/s Facha Enterprises Pvt. Ltd.
M/s Nazir Ahmed & Sons Construction Company Nazir House Main Khalta road Nom ...
PAA One Month
From: Oct 27, 2025
To: Nov 26, 2025
Provision of Special Persons for ETS with Allied Facilities at Gilgit Airport
Duration Completed
5 BLK-355
BLK-2026-000193
M/s Shah and Sons Engineering & Constructors, Peshawar
Village Palochi Authozi, Near Agricultural University, Peshawar
National Grid Company of Pakistan (NGC) 6 Months
From: Sep 26, 2025
To: Mar 25, 2026
4 Months
Non-performance of contractual obligations
Duration Completed
6 BLK-353
BLK-2026-000032
M/s Henan Go Bio-techCo. Ltd
No. 1016, Floor 10, Building A' No 55, Lianhua Street, High Tech industrial ...
POF 06 Months
From: Aug 20, 2025
To: Feb 19, 2026
4 Months
Failure to comply with the contractual obligations.
Duration Completed
7 BLK-352
BLK-2026-000195
M/S Zibo Taiguang Electrical Equipment, china
China
National Grid Company of Pakistan 1 Year
From: Aug 13, 2025
To: Aug 12, 2026
10 Months
Non-performance of contractual obligations
Duration Completed
8 BLK-351
BLK-2026-000016
M/S Unique Business Systems
26-27 B Basement 20-21 1st Floor Al-Amin Plaza The Mall Rawalpindi
POF 06 Months
From: Jul 29, 2025
To: Jun 28, 2026
9 Months
Failure to accept the contract and supply of printers
Duration Completed
9 BLK-347
BLK-2026-000253
M/s Shandong Taikai Disconnector Co. Ltd
Taikai Industrial Park, High-tech Development Zone (South), Tai'an, China
National Grid Company of Pakistan 6 Months
From: Jul 31, 2025
To: Jan 31, 2026
6 Months
Fake performance certificates
The Blacklisting order dated 31-07-2025 passed by NGC is set-aside by the PPRA dated 09-10-2025
10 BLK-345
BLK-2026-000020
M/S Technoart Engineering SMC Pvt Ltd.
Blue Area Islamabad
Pakistan Single Window (PSW) 01 Year
From: Jul 22, 2025
To: Jul 21, 2026
10 Months
Inauthentic and Misrepresentated
Duration Completed
11 BLK-344
BLK-2026-000021
M/S Tricom PWR (SMC-PVT) Ltd
New Katarian Satellite Town, Rawalpindi
SSGC 06 Months
From: Apr 21, 2025
To: Oct 21, 2025
6 Months
Failed to Perform Contractual Obligations.
Duration Completed
12 BLK-342
BLK-2026-000034
M/s Chand Brothers
Taj Petrol Pump, Ranipur, District Kahirpur Mirs
National Highway Authority (NHA) 1 Year
From: Apr 29, 2025
To: Apr 28, 2026
10 Months
Defaulting event / non-performance of contract
Duration Completed
13 BLK-339
BLK-2026-000035
M/s Bukhari Muslim & Chand Brothers (JV)
Near OK Service Saida Goth Khairpur Mirus Sindh
National Highway Authority (NHA) 1 Year
From: Apr 29, 2025
To: Apr 28, 2026
10 Months
Defaulting event / nonperformance of contract
Duration Completed
14 BLK-338
BLK-2026-000036
M/s Mustafa Services Pvt. Ltd.
124-Z-C-2 Near Butt Chowk Township Lahore
National Highway Authority (NHA) 1 Year
From: Apr 29, 2025
To: Apr 28, 2026
10 Months
Defaulting event / nonperformance of contract
Duration Completed
15 BLK-335
BLK-2026-000022
M/S Munir & Co
Plot No. 1 Block K Near Kashaf Foundation Johar Town, Lahore
GEPCO 6 Months
From: Apr 21, 2025
To: Oct 20, 2025
4 Months
Failed to Provide Satisfactory Performance
Duration Completed
16 BLK-334
BLK-2026-000037
M/S Bhatti Shamsuddin Enterprises (Pvt) JV M/S Shama & Zain Meo Rajpoot Construction Company
Shop No. 91 & 9, Block C3, Haroon Royal City, Phase-3, Block 17, Gulshan Jau ...
Pakistan National Shipping Corporation (PNSC) 1 Year
From: Mar 15, 2025
To: Apr 23, 2026
1 Year 1 Month
Failed to Provide Satisfactory Performance
Duration Completed
17 BLK-329 (HQ Logistic Area)
BLK-2026-000254
M/s Shah Faisal & Coy
House NO. 4, Arbab Town, Samungli Scheme, Quetta
Headquarter Rawalpindi Logistics Area Supply and Transport Branch 1 Year
From: Dec 23, 2024
To: Dec 22, 2025
10 Months
Involved in Illegal Gratification
PPRA Review Petition Committee Partly Allowed the Petition and Reduced the Blacklisting Period from ten (10) years to One (1) year
18 BLK-322 (HQ Logistic Area)
BLK-2026-000255
M/s Khan Enterprises
Dephal Khurd Luni Road Sibi
Headquarter Rawalpindi Logistics Area Supply and Transport Branch 1 Year
From: Dec 23, 2024
To: Dec 22, 2025
10 Months
Involved in Illegal Gratification
PPRA Review Petition Committee order dated 31-12-2025 Partly Allowed the Petition and Reduced the Blacklisting Period from Ten (10) years to One (1) Years
19 BLK-321
BLK-2026-000201
M/S Carbon 08 (Pvt), Islamabad
House No. 848, St 78, I8/3 Islamabad
Ministry of Industries and Production 1 Year
From: Jan 15, 2025
To: Jan 14, 2026
10 Months
Failure to Deliver the Project Components.
Duration Completed
20 BLK-320
BLK-2026-000256
M/S Lahore Traders, Rawalpindi
Office No. 01, 2nd Floor, Zeeshan Plaza, G253, Liaqat Road, Rawalpindi
PIMS 3 Years
From: Feb 15, 2025
To: Feb 14, 2028
2 Years 10 Months
Failed to fulfill Contractual Obligations.
The Blacklisting order dated 15-02-2025 passed by PIMS is set-aside by the PPRA dated 18-12-2025
21 BLK-317
BLK-2026-000042
M/S National Technologies Inc
Office No. 114, Sumya Business Avenue Muhammad Ali Society, Karachi.
Pakistan National Shipping Corporation (PNSC) 1 Year
From: Jan 22, 2025
To: Jan 21, 2026
10 Months
Failed to Provide Satisfactory Performance
Duration Completed
22 BLK-316
BLK-2026-000257
M/S I.H Malik & Co
70-C Model Town, Multan
MEPCO 3 Years
From: Jan 20, 2025
To: Jan 19, 2028
2 Years 10 Months
Failed to Provide Satisfactory Performance
The Blacklisting order dated 20-01-2025 passed by MEPCO is set aside by PPRA dated 13-05-2025
23 BLK-313
BLK-2026-000045
M/s Hizbullah Khan & Sons
Near Mehmood Eye Line Hospital, Saeed Abad, Dera Ismail Khan
NTDC 1 Year
From: Dec 09, 2024
To: Dec 08, 2025
10 Months
Maintaining two different sets of audited financial statements for the same period.
Duration Completed
24 BLK-306
BLK-2026-000049
M/S OJS Traders (Pvt) Ltd
B2, 2nd Floor, Lamcy Arcade, Opp Green, FakhreAlam Road, Peshawar Cantt
PIMS 1 Year
From: Oct 29, 2024
To: Oct 28, 2025
10 Months
Submission of Fake Documents.
Duration Completed
25 BLK-304
BLK-2026-000258
M/S Malik Enterprises
Shop 58, Ismail Jee Market, 2nd Floor, Jinnah Road, Rawalpindi
PIMS 6 Months
From: Oct 14, 2024
To: Apr 13, 2025
4 Months
Failed to fulfill Contractual Obligations.
Duration Completed
26 BLK-303
BLK-2026-000259
M/S Abaseen General Order Supplier
House No. 1049, St 56, Sector I-14/3, Islamabad
PIMS 6 Months
From: Oct 10, 2024
To: Apr 09, 2025
4 Months
Failed to fulfill Contractual Obligations.
The Blacklisting order dated 10-10-2024 passed by PIMS is set-aside by the PPRA dated 02-01-2025
27 BLK-302
BLK-2026-000260
M/S Services Syan Group
889-B Ashiana-e-Quaid Feroz purr Road, Lahore
Shaheed Zulfiqar Ali Bhutto Medical University 6 Months
From: Aug 24, 2024
To: Feb 23, 2025
4 Months
Failed to fulfill Contractual Obligations.
Duration Completed
28 BLK-302T
BLK-2026-000051
M/S Brother Gas Bottling & Distribution Company Pvt Ltd (Local Agent)
Office No. 947 Tricon Business Centre, 9th Floor Main Boulevard, Gulberg, Lahor ...
SSGC 2 Years
From: Aug 06, 2024
To: Aug 07, 2026
2 Years
Failed/Refuse to Deliver Material.
Duration Completed
29 BLK-301
BLK-2026-000052
M/S S.I Raza Co. (Pvt.) Ltd
Plot No. A681, Block 12, Gulberg F.B Area Karachi.
SSGC 2 Years
From: Jul 23, 2024
To: Jul 22, 2026
1 Year 10 Months
Failed/Refuse to Deliver Material
Duration Completed
30 BLK-300
BLK-2026-000261
M/S Medigas (Pvt) Ltd
Bagaria Road, Green Town Lahore
PIMS 2 Years
From: Aug 26, 2024
To: Aug 25, 2026
1 Year 10 Months
Failed to fulfill Contractual Obligations.
The Blacklisting order dated 26-08-2024 passed by PIMS is set-aside by the PPRA dated 06-03-2025
31 BLK-299
BLK-2026-000262
M/S Services Syan Group
889-B, Ashiana E Quaid Feroze Purr Road, Lahore
PIMS 6 Months
From: Aug 24, 2024
To: Feb 23, 2025
4 Months
Failed to fulfill Contractual Obligations.
Duration Completed
32 BLK-294 (Gujranwala Electric Power Company Limited)
BLK-2026-000263
M/S Al-Amin Enterprises
Suit No. 13-14 Afridi Mension, 63-Shadman Market Lahore.
National Electric Power Regulatory Authority (NEPRA) 6 Months
From: Aug 01, 2024
To: Feb 28, 2025
6 Months
Failed to fulfill Contractual Obligations.
The Blacklisting order dated 08-08-2024 is suspended by the Islamabad High Court, order dated 05-11-2024 Until the next date of hearing.
33 BLK-292
BLK-2026-000055
M/S Farooq Khan & Brother Pvt Ltd
Bungalow No. 514A/62A, Madrassa Road Street No. 3 Quetta Cantt
Quetta Electric Supply Company (QESCO) 2 Years
From: Jun 10, 2024
To: Jun 09, 2026
1 Year 10 Months
Default in Supply of Order.
Duration Completed
34 BLK-291 (Federal Government Services Hospital)
BLK-2026-000264
M/S Rawal Biomedical Services
Office No. 4, 2nd Floor, mall Plaza, Mall Road Saddar, Rawalpindi
Ministry of National Health Services Regulations & Coordination (M/o NHSR&C) 6 Months
From: Jun 20, 2024
To: Dec 19, 2024
4 Months
Non compliance of supply order.
Duration Completed
35 BLK-290
BLK-2026-000056
M/S Drilling Solutions Pakistan (Pvt) Ltd
R15 Rufi Rose Petal, Sector 15/A, KDA Scheme 33, Gulzar-e-Hijri, Karachi
SSGC 2 Years
From: Jun 04, 2024
To: Jun 03, 2026
1 Year 10 Months
Failed/Refuse to Deliver Material
Duration Completed
36 BLK-288
BLK-2026-000058
M/S S.A Engineering Works
Room No. 310,  3rd Floor Japan Plaza, M.A Jinnah Road Karachi.
SSGC 2 Years
From: May 24, 2024
To: May 23, 2026
1 Year 10 Months
Failed/Refuse to Deliver Material.
Duration Completed
37 BLK-287
BLK-2026-000265
M/S Rewterz Information Security
205, Asia Pacific Trade Centre, Rashid Minhas Road, Karachi
Sui Southern Gas Company Limited 1 Year
From: Mar 12, 2024
To: Mar 11, 2025
10 Months
Failed to fulfill Contractual Obligations.
The Blacklisting order dated 12-03-2024 passed by SSGC is set-aside by the PPRA dated 10-10-2024.
38 BLK-286
BLK-2026-000059
M/S MKR & Company
Banglow No. C173, Govt Housing Scocity, Airport Road, Sukkur
SSGC 2 Years
From: Mar 07, 2024
To: Mar 06, 2026
1 Year 10 Months
Failed to fulfill Contractual Obligations.
Duration Completed
39 BLK-285
BLK-2026-000060
M/S National Electric Centre
Office No. 04 2nd Floor, Imtiaz Chamber, 85A, Tample Road, Lahore.
SSGC 2 Years
From: Apr 25, 2024
To: Apr 24, 2026
1 Year 10 Months
Failed to fulfill Contractual Obligations.
Duration Completed
40 BLK-282
BLK-2026-000062
M/S Steelman Electro Mechanical Company (Pvt) Ltd, Islamabad
Building No. 52 Waheed Plaza, 3rd Floor Blue Area, Islamabad
National Highway and Motorway Police (NHMP) 1 Year
From: May 29, 2024
To: May 28, 2025
10 Months
Non Supplying of Requisite Items
Duration Completed
41 BLK-277
BLK-2026-000266
M/S Faiz Shareef Const. Co & M/S SPARCO (JV)
National Highway Authority (NHA) 1 Year
From: Apr 04, 2024
To: Apr 03, 2025
10 Months
Short Fall on Chanab Toll Plaza
The Blacklisting order dated 04-04-2024 is suspended by the Islamabad High Court, order dated 04-07-2024 Until the next date of hearing.
42 BLK-277-T
BLK-2026-000383
M/S Good Luck Enterprises
National Highway Authority (NHA) 1 Year
From: Apr 04, 2024
To: Apr 03, 2025
10 Months
Short Fall on Sadiqabad and Gujranwala Toll Plaza
The Blacklisting order dated 04-04-2024 passed by NHA is set-aside by the PPRA dated 15-12-2024
43 BLK-276
BLK-2026-000267
M/S Rano Khan Jaskani
National Highway Authority (NHA) 1 Year
From: Apr 04, 2024
To: Apr 03, 2025
10 Months
Short Fall on Ranipur Toll Plaza
Duration Completed
44 BLK-276-T
BLK-2026-000384
M/S Alhaj Abdul Ghaffar Bhatti
National Highway Authority (NHA) 1 Year
From: Apr 04, 2024
To: Apr 03, 2025
10 Months
Short Fall on Sakhi Sarwar Toll Plaza
Duration Completed
45 BLK-275
BLK-2026-000268
M/S Sherzaman Contractors
National Highway Authority (NHA) 1 Year
From: Apr 04, 2024
To: Apr 03, 2025
10 Months
Short Fall on Sultan Bahoo Bridge and Harro Toll Plaza
Duration Completed
46 BLK-274
BLK-2026-000269
M/S Rano Khan Jaskani & Abdul Karim Builders (JV)
National Highway Authority (NHA) 1 Year
From: Apr 04, 2024
To: Apr 03, 2025
10 Months
Short Fall on Chenab SBC (ETTM) and Khanbela Toll Plaza
The Blacklisting order dated 04-04-2024 is suspended by the Islamabad High Court, order dated 04-07-2024 Until the next date of hearing.
47 BLK-273
BLK-2026-000270
M/S Khawaja Waqar Associates
National Highway Authority (NHA) 1 Year
From: Apr 04, 2024
To: Apr 03, 2025
10 Months
Short Fall on Taunsa Toll Plaza
Duration Completed
48 BLK-272
BLK-2026-000271
M/S Bara Brothers & M/S Waleed Associates (JV)
National Highway Authority (NHA) 1 Year
From: Apr 04, 2024
To: Apr 03, 2025
10 Months
Short Fall on Mandra (ETTM) Toll Plaza
Duration Completed
49 BLK-271
BLK-2026-000272
M/S Chand Brothers
National Highway Authority (NHA) 1 Year
From: Apr 04, 2024
To: Apr 03, 2025
10 Months
Short Fall on Amri Qazi and Talibwala Toll Plaza
Duration Completed
50 BLK-270
BLK-2026-000273
M/S Pervaiz Ahmed Contractors
National Highway Authority (NHA) 1 Year
From: Apr 04, 2024
To: Apr 03, 2025
10 Months
Short Fall on Chundh Bridge Toll Plaza
Duration Completed
51 BLK-269
BLK-2026-000274
M/S MAB Brothers
National Highway Authority (NHA) 1 Year
From: Apr 04, 2024
To: Apr 03, 2025
10 Months
Short Fall on Hassanabdal Toll Plaza
The Blacklisting order dated 04-04-2024 is suspended by the Islamabad High Court, order dated 24-04-2024 Until the next date of hearing.
52 BLK-268
BLK-2026-000275
M/S Al-Haj Muhammad Ashraf Bhatti
National Highway Authority (NHA) 1 Year
From: Apr 04, 2024
To: Apr 03, 2025
10 Months
Short Fall on Mehar Toll Plaza
Duration Completed
53 BLK-267
BLK-2026-000276
M/S Rana Associates
National Highway Authority (NHA) 1 Year
From: Apr 04, 2024
To: Apr 03, 2025
10 Months
Short Fall on Jhelum Toll Plaza
Duration Completed
54 BLK-266
BLK-2026-000277
M/S Rana Ishtiaq & Co
National Highway Authority (NHA) 1 Year
From: Apr 04, 2024
To: Apr 03, 2025
10 Months
Short Fall on Tarraki Toll Plaza
Duration Completed
55 BLK-263
BLK-2026-000278
M/S Smart Technologies
A-6 Karim Square, Near Gala Restaurant, Sir Shah Suleman Road, Block 13-D, Gulsh ...
Sui Southern Gas Company Limited 6 Months
From: Jan 19, 2024
To: Jul 18, 2024
4 Months
Deviation of Contractual Obligations.
Duration Completed
56 BLK-260
BLK-2026-000279
M/S Apex Alpha Trading Concern
1st Floor, Yashfeen Plaza, Ch Walayat Khan Road Chaklala Scheme-III, Rawalpindi
National Telecommunication Corporation (NTC) HQs 6 Months
From: Mar 06, 2024
To: Sep 05, 2024
4 Months
Due to non-compliances/failure of contractual obligations
Duration Completed
57 BLK-259
BLK-2026-000280
M/S New Khosa Brothers Construction Builder Co.
WDCO Office, Near Chungi, Quetta Road, Dera Allah Yar, Jaffarabad
Sui Southern Gas Company Limited 1 Year
From: Feb 27, 2024
To: Feb 25, 2025
10 Months
Failing to Fulfill Contractual Obligations.
Duration Completed
58 BLK-257
BLK-2026-000281
M/S Megaplus
House # 1015, Street 44, Section E 11/3 Islamabad
FBR 3 Years
From: Feb 06, 2024
To: Feb 05, 2027
2 Years 10 Months
Failing to Fulfill Contractual Obligations.
The Blacklisting order dated 06-02-2024 passed by FBR is set-aside by the PPRA dated 04-04-2024.
59 BLK-246
BLK-2026-000282
M/S X-Track Pvt Ltd
Huma Plaza, AKM Fazl-ul-Haq Road
Pakistan Petroleum Limited (PPL) 1 Year
From: Jan 09, 2024
To: Jan 08, 2025
10 Months
Found indulged in fraudulent practices
Duration Completed
60 BLK-244
BLK-2026-000068
M/S Abdul Majeed Khan Sithari
Wali Colony Chuchak Road, Renala Khurd, Okara
National Highway Authority (NHA) 2 Years
From: Dec 19, 2023
To: Dec 18, 2025
1 Year 10 Months
On Account of Failed to Complete the Work within stipulated time.
Duration Completed
61 BLK-243
BLK-2026-000283
M/S Shoukat Khan & Company
ABBOT Height Near Frontier Medical College Mansehra Road, Abbottabad
Water and Power Development Authority (WAPDA) 10 Years
From: Dec 04, 2023
To: Dec 03, 2033
9 Years 10 Months
Due to fraudulent Practices.
The Blacklisting order dated 04-12-2023 passed by WAPDA is set-aside by the PPRA dated 04-04-2024.
62 BLK-242 (Metropolitan Corporation)
BLK-2026-000284
Auction Participants
Local government & Rural Development ICT 1 Year
From: Dec 12, 2023
To: Dec 11, 2024
10 Months
Non-Compliance and Negative Impact on the Auction Process
Duration Completed
63 BLK-240
BLK-2026-000285
M/S City Traders
Office No. 112, 1st Floor, Abu Dhabi Tower
PWD 6 Months
From: Dec 11, 2023
To: Jun 10, 2024
4 Months
Due to Fraudulent Practices
Duration Completed
64 BLK-239
BLK-2026-000286
M/S Modern Enterprises
R-385, Malik Society, Sector 16A, Gulzar-e-Hijri, Scheme 33, Gulshan-e-Iqbal, Ka ...
Sui Southern Gas Company Limited 6 Months
From: Dec 07, 2023
To: Jun 06, 2024
4 Months
Due to non-compliances/failure of contractual obligations
Duration Completed
65 BLK-238
BLK-2026-000287
M/S Total Engineering Pvt Limited, Islamabad
72 West, 3rd Floor, Benazir Plaza, Block H, Jinnah Ave, Blue Area Islamabad.
Pakistan Petroleum Limited (PPL) 6 Years
From: Nov 28, 2023
To: Nov 27, 2029
5 Years 10 Months
Due to Indulging in Corrupt and fraudulent Practices.
The Blacklisting order dated 09-11-2023 passed by PPL is set-aside by the PPRA dated 27-02-2024
66 BLK-237
BLK-2026-000192 View
M/S Hafiz Hayat Ullah & Brothers, Peshawar
PhaseIII, Sector K6, Basharat Market Hayatabad, Peshawar.
Shaheed Zulfiqar Ali Bhutto Medical University 5 Years
From: Sep 04, 2023
To: Sep 03, 2028
4 Years 10 Months
Reasons:
Submission of Fake Bank Guarantee.

The Blacklisting order dated 04-09-2023 is suspended by the Islamabad High Court, order dated 09-07-2024 Until the next date of hearing
67 BLK-234
BLK-2026-000288
M/S Al Meezan Industrial Metrology Services
58, B-Block, OPF Lahore
Sui Southern Gas Company Limited 6 Months
From: Oct 26, 2023
To: Apr 25, 2024
4 Months
Failed to Accomplish Contractual Obligations.
Duration Completed
68 BLK-233
BLK-2026-000289
M/S Skill Orbid (Pvt) Ltd.
Office No. 601, Windsong Palace, KCHSU Block 7/8, Karachi
Sui Southern Gas Company Limited 1 Year
From: Oct 16, 2023
To: Oct 15, 2024
10 Months
Failure/Refused to Execution of Provision, Installation, Development Testing, Configuration Training ...
Duration Completed
69 BLK-190
BLK-2026-000012
M/S Pan Power International Pvt. Ltd
FF13, Leeds Center, Main Boulevard GulbergIII, Lahore
MEPCO 3 Years
From: Nov 15, 2022
To: Nov 14, 2025
2 Years 10 Months
Failure to Fulfill Supply Order.
Blacklist Remarks:
The Blacklisting order dated 15-11-2022 is suspended by the Islamabad High Court, order dated 07-03-2023 Until the next date of hearing.
70 BLK-189
BLK-2026-000013
M/S Asia Pacific
House No. 236, Street No. 11, Sector E7, Islamabad
Pakistan Aeronautical Complex 3 Years
From: Jan 19, 2023
To: Jan 18, 2026
2 Years 10 Months
Failure to Materialize Outstanding Contracts
Duration Completed
71 BLK-188
BLK-2026-000290
M/S KSB Pumps Company
3rd Floor, Plot No. 31/1-A, Block-6 P.E.C.H.S, Shahrah-e-Fasisal Karachi
Pakistan State Oil 4 Months
From: Sep 08, 2023
To: Jan 07, 2024
2 Months
Refusal of acceptance of LOI
Duration Completed
72 BLK-187
BLK-2026-000291
M/S Fluent Printing & Packaging
B2/1, Maymar Drive, Rashid Minhas Road, Gulshan-e-Iqbal, Block 10, Karachi
Pakistan State Oil 2 Months
From: Sep 08, 2023
To: Nov 07, 2023
Refusal of acceptance of LOI
Duration Completed
73 BLK-186
BLK-2026-000292
M/S Sabri Plastic Store, Lahore (Local Agent) and M/S Taizhou Reliabond co. Ltd (Principle)
5-Fazal, Building Cooper Road, Lahore
Pakistan State Oil 1 Year
From: Aug 05, 2023
To: Aug 04, 2024
10 Months
Breach from Term and Condition in Purchase Order
Duration Completed
74 BLK-184
BLK-2026-000293
M/S FinErts
236, Badar Block, Allama Iqbal Town, Lahore
National Telecommunication Corporation (NTC) 5 Years
From: Aug 01, 2023
To: Jul 31, 2028
4 Years 11 Months
Misrepresentation, Forgery.
The Blacklisting order dated 01-08-2023 is suspended by the Lahore High Court, order dated 16-08-2023 Until the next date of hearing.
75 BLK-183 (Utility Stores Corporation of Pakistan)
BLK-2026-000294
M/S Batool Rice Mills
House No.478, Ravi Block, Allama Iqbal Town, Lahore
Ministry of Industries and Production 6 Months
From: Jul 26, 2023
To: Jan 25, 2024
4 Months
Due to non-compliances/failure of contractual obligations
The Blacklisting order dated 26-07-2023 is suspended by the Lahore High Court, order dated 03-08-2023 Until the final decision.
76 BLK-182 (Utility Stores Corporation of Pakistan)
BLK-2026-000295
M/S Ikram Rice Mills
Near More Eminabad, G.T. Road, Gujranwala
Ministry of Industries and Production 6 Months
From: Jul 26, 2023
To: Jan 25, 2024
4 Months
Due to non-compliances/failure of contractual obligations
Duration Completed
77 BLK-181 (Utility Stores Corporation of Pakistan)
BLK-2026-000296
M/S Thal Rice Industries
3 Km Fathepur Road, Chawk Azam, Layyah
Ministry of Industries and Production 6 Months
From: Jul 26, 2023
To: Jan 25, 2024
4 Months
Due to non-compliances/failure of contractual obligations
The Blacklisting order dated 26-07-2023 is suspended by the Lahore High Court, order dated 18-08-2023 Until the final decision.
78 BLK-180 (Utility Stores Corporation of Pakistan)
BLK-2026-000297
M/S Muhammad Akram & Company
Grain Market 8 KM Multan Road , Sahiwal, Pakistan
Ministry of Industries and Production 6 Months
From: Jul 26, 2023
To: Jan 25, 2024
4 Months
Due to non-compliances/failure of contractual obligations
The Blacklisting order dated 26-07-2023 passed by USC is set-aside by the PPRA dated 24-10-2023.
79 BLK-179 (Utility Stores Corporation of Pakistan)
BLK-2026-000298
M/S Nadeem Rice Mill & Rice Traders
Plot No. 119-H, Street No.8 Sector I-10/3, Islamabad
Ministry of Industries and Production 6 Months
From: Jul 26, 2023
To: Jan 25, 2024
4 Months
Due to non-compliances/failure of contractual obligations
The Blacklisting order dated 26-07-2023 is suspended by the Islamabad High Court, order dated 09-08-2023 Until the final decision.
80 BLK-178 (Utility Stores Corporation of Pakistan)
BLK-2026-000299
M/S Muhammad Ashraf & Company
Lakhodair More Shadipura, Daroghawala, Lahore
Ministry of Industries and Production 6 Months
From: Jul 26, 2023
To: Jan 25, 2024
4 Months
Due to non-compliances/failure of contractual obligations
The Blacklisting order dated 26-07-2023 is suspended by the Lahore High Court, order dated 03-08-2023 Until the final decision.
81 BLK-177
BLK-2026-000228
M/S Star Waves Enterprises
C8/A, Saghir Centre, Block16, Federal B Area, Karachi
Sui Southern Gas Company Limited 2 Years
From: Jul 07, 2023
To: Jul 06, 2025
1 Year 10 Months
Submission of Forged/Fake Certification.
Duration Completed
82 BLK-176
BLK-2026-000300
M/S MM Associate (Pvt) Ltd
E-17, Sector 50/C Korangi, Karachi
Pakistan State Oil 2 Years
From: May 17, 2023
To: May 16, 2025
1 Year 10 Months
Due to violation of term and conditions of service order.
The Blacklisting order dated 17-05-2023 is suspended by the IID Senior Civil Judge South, Karachi order dated 21-09-2024 Until the next date of hearing
83 BLK-175
BLK-2026-000017
M/S Suhail & Pasha
Camp Office 319 Nizamuddin Road, F11/1, Islamabad.
State Life Insurance Corporation of Pakistan 3 Years
From: Apr 19, 2023
To: Apr 18, 2026
2 Years 10 Months
Due to non-compliances/failure of contractual obligations.
Duration Completed
84 BLK-174
BLK-2026-000301
M/S Greaves Pakistan (Pvt) Ltd
Modern Motors House, Beaumont Road, Post Box 4908 Karachi
State Life Insurance Corporation of Pakistan 3 Years
From: Apr 19, 2023
To: Apr 18, 2026
2 Years 10 Months
Due to non-compliances/failure of contractual obligations.
The Blacklisting order dated 19-04-2023 passed by State Life Insurance Corporation of Pakistan is set-aside by the PPRA dated 21-08-2023
85 BLK-170
BLK-2026-000302
M/S Multilynx
Sector XX, 5-A, Commercial Area DHA, Phase-III, Lahore
Controller General of Accounts (CGA) Online Billing Solution Project DG MIS 3 Years
From: Feb 10, 2023
To: Feb 09, 2026
2 Years 10 Months
Due to non-compliances/failure of contractual obligations.
Duration Completed
86 BLK-169
BLK-2026-000303
M/S SWAP Traders
Office No. 36, Mezzanine Floor, Decent Garden East, Gulshan Town, Karachi
Sui Southern Gas Company Limited 1 Year
From: May 15, 2023
To: May 14, 2024
10 Months
Failed to Deliver the Material.
Duration Completed
87 BLK-168
BLK-2026-000304
M/S Victory Hardware Mart
28, Nishter Road, Lahore
National Highways and Motorway Police (NHMP) N-5 North Zone 1 Year
From: May 16, 2023
To: May 15, 2024
10 Months
Failure to Fulfill Supply Order.
Duration Completed
88 BLK-165
BLK-2026-000305
M/S United Insurance Company of Pakistan, Rawalpindi
2nd Floor, Century Tower, 6th the mall, Rawalpindi Cantt.
Wah Industries Limited (WIL) 10 Years
From: Mar 28, 2023
To: Mar 27, 2033
9 Years 10 Months
Failed to encash the guarantee
The Blacklisting order dated 28-03-2023 is set-aside by the Islamabad High Court, order dated 26-06-2024.
89 BLK-163 (Election Commission of Pakistan)
BLK-2026-000306
M/S Sabir Hussain & Co
House No. 1, Street No.11/12, Abdali Muhalla, Sant Nagar Road, Lahore
Provincial Election Commission-Balochistan (Headquarter) 1 Year
From: Aug 03, 2022
To: Aug 02, 2023
10 Months
Due to non-fulfillment of contractual obligations.
Duration Completed
90 BLK-161
BLK-2026-000307
M/S Grit Pvt. Ltd
3.5 km, Defence Road, Lahore
Peshawar Electric Supply Company (PESCO) 1 Year
From: Mar 07, 2022
To: Mar 06, 2023
10 Months
Due to non-fulfillment of contractual obligations.
Duration Completed
91 BLK-160
BLK-2026-000308
M/S Kontinental Establishment
Suit No. 112, 1st Floor, Europe Center, Hasrat Mohani Road, Karachi
IT Centre, National Textile University (NTU) 5 Years
From: Jan 21, 2023
To: Jan 20, 2028
4 Years 10 Months
Failure to Fulfill Supply Order.
The Blacklisting order dated 21-03-2023 passed by NTU is set-aside by the PPRA dated 06-06-2023
92 BLK-158
BLK-2026-000309
M/S Beijing Zetron Technology Co. Ltd
Room No. 1302, Yufei Building, 42 Dongzhimenwai Street, Dongcheng District, Beij ...
Sui Southern Gas Company Limited 2 Years
From: Jan 17, 2023
To: Jan 16, 2025
1 Year 10 Months
Submission of Forged/Fake Certification.
Duration Completed
93 BLK-157
BLK-2026-000310
M/S MRM International
House No. R-802, Block-14 F.B Area, Karachi
Sui Southern Gas Company Limited 1 Year
From: Dec 28, 2022
To: Dec 27, 2023
10 Months
Failed/Refused to Deliver the Distribution Service Material
Duration Completed
94 BLK-156
BLK-2026-000311
M/S Rehmpack (Pvt) Ltd
32/2 Sector 15, Korangi Industrial Area, Karachi
Pakistan State Oil 3 Years
From: Mar 13, 2023
To: Mar 12, 2026
2 Years 10 Months
Failed to Submit the pay order within the stipulated timeline
Duration Completed
95 BLK-155
BLK-2026-000312
M/S Sinopec International Petroleum Services Corporation
House No. 11, Street No.49-Sector F-6/4, Islamabad
Oil and Gas Development Company Limited (OGDCL) 6 Months
From: Feb 08, 2023
To: Aug 07, 2023
4 Months
Failed to submit 10% PBG.
Duration Completed
96 BLK-153
BLK-2026-000313
M/S Zakir-ur-Rehman Abbasi & Brother
Office No.702, Al Ghafoor Livena, Nazimabad No. 3, Karachi
Sui Southern Gas Company Limited 1 Year
From: Feb 07, 2023
To: Feb 06, 2024
10 Months
Due to failure / refused to submit PBG/other requisite documents.
Duration Completed
97 BLK-152
BLK-2026-000314
M/S Standard Mechanical Works
CI-23, Sector-6b, North Karachi Industrial Area, Karachi
Sui Southern Gas Company Limited 2 Years
From: Nov 21, 2022
To: Nov 20, 2024
1 Year 10 Months
Due to deviation of tender term and non-fulfillment of contractual obligations.
Duration Completed
98 BLK-151
BLK-2026-000315
M/S New Khalid Enterprises
Room No.3 Plot No.583, Street No. 3 Gate No. 2 New Truck Stand Maripur Hawksbay ...
Pakistan State Oil 1 Year
From: Feb 03, 2023
To: Feb 02, 2024
10 Months
On account of Breach of Term and Conditions of Purchase Order
Duration Completed
99 BLK-150
BLK-2026-000316
M/S Grit Pvt. Ltd
3.5 km, Defence Road, Lahore
Multan Electric Power Company (MEPCO) 3 Years
From: Oct 19, 2022
To: Oct 18, 2025
2 Years 10 Months
Due to non-fulfillment of contractual obligations.
The Blacklisting order dated 19-10-2022 is suspended by the Civil Court-Multan, order dated 21-11-2022 Until the next date of hearing
100 BLK-149
BLK-2026-000317
M/S M.A Engineering Services International
Office No. 391-C OPF Housing Society Scheme, Phase-I, Lahore
Shaikh Zayed Hospital (SZH) 10 Years
From: Dec 31, 2022
To: Dec 30, 2032
9 Years 10 Months
Submission of False and Fake Documents.
The Blacklisting order dated 20-10-2022 passed by Shaikh Zayed Hospital is set-aside by the PPRA dated 14-09-2023
Related Links:
Scroll